Custom dispersion · wet grinding · mixing

Industrial mixing, dispersion
& wet grinding equipment.

Compare a mixing tank, sand mill or bead mill, and high-speed disperser around one process brief for your material, target, transfer route and controls.

01

Start with material behavior and the target result—not a generic catalogue model.

Process route / 01Process-led
FeedDefined by process data
TargetSet by the process goal
01

Disperse

02

Grind

03

Finish

What the right proposal starts with

01Material
02Viscosity
03Batch
04Target size
05Cleaning

System portfolio

Specify the process. Then specify the machine.

The initial scope connects five equipment families around a customer's formulation, production target and plant constraints.

01

Pre-mix & emulsify

Emulsifying & Dispersing Mixing Tank

Bring liquid addition, powder wet-out and high-shear dispersion into one configurable batch stage.

  • Batch volume
  • Viscosity curve
  • Powder addition
  • Temperature
Explore equipment
02

Wet grinding

Horizontal Bead Mill / Sand Mill

Develop the grinding route around feed size, target fineness, throughput and contamination limits.

  • Feed size
  • Target fineness
  • Media
  • Throughput
Explore equipment
03

Fast dispersion

High-Speed Disperser

Match the vessel, dispersing disc and drive arrangement to the material and production sequence.

  • Disc size
  • Tip speed
  • Lift mode
  • Vessel geometry
Explore equipment
04

Blend & hold

Custom Mixing / Storage Tank

Configure agitation, thermal duty, fittings and cleaning access around the job the vessel must do.

  • Agitator duty
  • Jacket duty
  • Finish
  • Connections
Explore equipment
05

Connected systems

Dispersion-to-Grinding Line

Map pre-mix, milling, let-down, transfer and control interfaces as one practical process route.

  • Process order
  • Recirculation
  • Controls
  • Utilities
Explore equipment

Integrated process route

One batch. Five connected decisions.

The line is defined by what changes at each stage—particle state, viscosity, temperature, residence time and handling.

01

Wet-out

Introduce powders and liquids in a controlled pre-mix sequence.

02

Disperse

Break down agglomerates and establish a stable mill feed.

03

Refine

Select a single-pass or recirculation grinding route from the target.

04

Finish

Let down, adjust, homogenize and prepare the batch for transfer.

05

Hold

Maintain consistency while filling, filtering or feeding the next step.

A—01

The engineering handoff

A connected line needs interface data, not five quotations.

Confirm material balance, transfer method, controls boundary, utility conditions and cleaning sequence before equipment is released.

Map the complete process line ↗

Application routes

Different formulations. Different questions first.

Move from formula behavior to a practical sequence of wet-out, dispersion, grinding, finishing and transfer.

ApplicationTypical process challengeStarting route
01Coatings & inks

Pigment wet-out, color development and batch consistency

Pre-mix → bead mill → let-down

02Pigments & colorants

Agglomerate reduction and controlled particle distribution

Dispersion → recirculation grinding

03Adhesives & sealants

Viscosity change, powder incorporation and heat management

High-shear mix → final blend

04Personal & home care

Emulsion formation, uniformity and cleanable product contact

Emulsify → homogenize → hold

05Specialty slurries

Solids loading, suspension stability and contamination control

Condition → grind → transfer

A cleaner engineering handoff

One process route. Fewer loose ends.

Treat each machine as part of one batch path, so flow, transfer, utilities and controls are considered together from the start.

01Process brief

Material, viscosity and output target

02Equipment route

Disperse, grind, finish and hold

03Interface map

Transfer, utilities and controls

04Proposal scope

Boundaries, options and deliverables

Engineering library

Make the buyer better at specifying.

Use these guides to frame the right selection questions and build a sharper process brief before equipment discussions begin.

Selection guide01

Sand Mill vs Bead Mill

Where the terms overlap—and which process data actually determines the mill route.

Open decision guide ↗
Operating-mode guide02

Single-Pass vs Recirculation

Compare material path, endpoint control, heat, handling and changeover as one decision.

Open decision guide ↗
Specification guide03

How to Brief a Mixing Tank

The process, material and cleaning inputs an engineer needs before discussing hardware.

Open decision guide ↗
Engineering note04

Agitator Selection by Viscosity

A practical framework for separating circulation, shear and suspension duties.

Open decision guide ↗
Process-system guide05

Dispersion-to-Grinding Line

Define stage endpoints, transfer interfaces and shared controls across the batch route.

Open decision guide ↗

RFQ process brief

Give us the process problem—not just a tank size.

Capture the few inputs that determine the equipment route. The tool formats them into a brief you can copy and share.

Before quotation
  • Product and solids content
  • Viscosity and temperature range
  • Batch size or target throughput
  • Feed size and target fineness
  • Cleaning, utilities and controls
Brief / 01No email or account required

Started from: General process brief

No email is collected. Your details stay in this browser; nothing is uploaded or sent.

Scope notes

Clear language before engineering language.

Is a sand mill the same as a bead mill?

The terms are often used for related wet-grinding equipment. The useful distinction is the actual mill geometry, media, separation system and process target—not the label alone.

Do you supply “reactors”?

“Reactor” describes a process vessel where a controlled reaction occurs; it is not a substitute for “mixing tank.” Define the process conditions and required design basis first, then use the term that accurately describes the equipment.

What is needed before equipment can be sized?

At minimum: material composition, solids, viscosity, batch or flow requirement, feed condition, target result, temperature, cleaning method and available utilities.

Can the tank and mill be proposed as one line?

Yes. One process brief can map the unit operations and interfaces, then define the equipment, controls and supply boundaries as one connected route.

WhatsApp+86 134 1703 0422