| Intended fluid motion | The supplier identifies the non-target rotation to be interrupted and the circulation required for each process stage. | The supplier explains why no wall baffle is proposed and how mounting, vessel shape or another stated element manages—or deliberately preserves—the required motion. | Duty by stage, acceptable surface behavior, circulation or suspension observations, air or foam concern and unresolved questions. |
|---|
| Vessel and mounting | Record vessel shape, bottom, working levels, shaft position, impeller and the exact baffle count, form, position, gaps, attachment and removability proposed by the supplier. | Record the same base vessel and impeller details plus any offset, angle, orientation, non-cylindrical shape, frame element or other anti-rotation feature. | Controlled drawing, dimensions and revision; identify the single intended test difference or disclose the complete set of geometry changes. |
|---|
| Changing batch | Review the proposed baffle action as fill level, rheology, solids state, temperature and duty change through the sequence. | Review whether the alternative arrangement has the same purpose at low- and high-rheology stages and during minimum, normal and maximum working quantities. | Material supplier and lot, batch sequence, working quantity, stage observations, sample identities, deviations and disposition. |
|---|
| Internals and interfaces | Check baffle clearance and interaction with coils, dip pipes, feed points, sensors, covers, shaft removal, discharge and inspection access. | Check the same interfaces against the proposed shaft orientation, tank corners, frame element or other topology-specific internal path. | Reviewed general arrangement, interference register, thermal and transfer interfaces, access method, owner and open actions. |
|---|
| Recovery and cleaning | Map product hold-up, surfaces behind or beneath baffles, attachment points, drainage, inspection, removal if proposed and the cleaning sequence. | Map residue and access around corners, angled shafts, frame elements or other features; unbaffled does not automatically mean clean or drainable. | Same recovery, cleaning chemistry, sequence, inspection points, residue-release method and failed-clean response for both candidates. |
|---|
| Trial and release | Trial the stated baffle arrangement with the controlled material, base geometry, impeller, level, sequence and acceptance method. | Trial the exact alternative arrangement on the same basis; if more than the baffle state changes, release only the complete tested topology. | Same endpoint and method, representative batch evidence, cleaning release, supplier confirmations, exclusions and change-control triggers. |
|---|