Equipment overview

Equipment for dispersion, wet grinding and final mixing.

Choose each machine by the job it performs in the batch—and by the condition it must hand to the next stage.

Start with a process brief

Three different decision jobs

Start with the stage that changes the material.

These commercial routes are connected, but each answers a different buying question and asks for a different process brief.

01

DISPERSION

High-Speed Disperser

Build the equipment brief around how powders enter the liquid, how the batch changes, and what condition must leave the disperser.

Process job
Powder wet-out and pre-dispersion
Handoff
Bead mill, final mixing or holding
Open equipment guide
02

WET GRINDING

Horizontal Bead Mill

Translate feed condition, target result and production method into a wet-grinding route that can be discussed without guessing at a model.

Process job
Wet grinding and particle refinement
Handoff
Let-down, final adjustment, filtration or holding
Open equipment guide
03

MIX & HOLD

Mixing Tank

Separate circulation, suspension, addition, temperature handling and transfer duties before choosing the tank and agitation arrangement.

Process job
Blend, let down, suspend, adjust or hold
Handoff
Filling, filtration, transfer or the next process stage
Open equipment guide

One line-level brief

Collect the inputs that cross equipment boundaries.

Use the individual equipment checklists for detail. At line level, keep these shared decisions in one place.

  1. 01
    Material path

    What enters, what changes and what must leave each stage.

  2. 02
    Stage endpoints

    The measurable or observable handoff condition.

  3. 03
    Transfer logic

    How material moves between vessel, mill and finishing step.

  4. 04
    Utilities & controls

    Available services and the boundary between local and line control.

  5. 05
    Cleaning sequence

    Product recovery, changeover order and access needs across the route.

Equipment planning FAQ

Choose by process role, then connect the line.

Which equipment should be specified first?

Start with the stage that controls the process result or creates the main constraint. For some lines that is powder wet-out; for others it is wet grinding, final blending or transfer. Map the full route before isolating one machine.

Can a disperser, bead mill and mixing tank be planned as one route?

Yes. A connected brief can define the feed condition, handoff between stages, transfer method, controls boundary, cleaning sequence and final batch objective.

Why is a horizontal bead mill also called a sand mill?

“Sand mill” remains a common industry and search synonym for related wet-grinding equipment. The selection decision should focus on the actual grinding duty, feed, target, pass strategy, media and separation approach.

Does every process vessel count as a reactor?

No. “Reactor” is a scope-dependent term for a vessel where a controlled reaction occurs. A mixing or holding vessel should not be described as a reactor without the process conditions and required design basis that make the term accurate.

Ready to map the route?

Start with the material, target and handoff between stages.

Build an RFQ brief
WhatsApp+86 134 1703 0422